NTPC#39;s 250 MW unit at Barauni power station becomes operational

NTPC#39;s 250 MW unit at Barauni power station becomes operational With this, the total installed capacity of NTPC and NTPC Group has become 48,895 MW and 57,356 MW, respectively, a company statement said.

No comments:

Post a Comment